Day 5 Photos Up

Posted on April 18th, 2007 by Patrick.
Categories: Uncategorized.

Day 5 photos are posted in the gallery. Todays work entailed finishing work on the vertical stabilizer skeleton. Numerous holes had to be match drilled, deburred, and final drilled. The nose ribs also had to be grinded to fit the stabilizer skin. The spar doubler plate also had to be machine countersunk. The alclad aluminum used in most of the parts has an amazing finish. This produced some really interesting photographs of the inside of the stabilizer. Tomorrow’s work will be to final drill the skin/skeleton rivet holes and begin dimpling of the skins and countersinking of more spar.

0 comments.

Leave a comment

Comments can contain some xhtml. Names and emails are required (emails aren't displayed), url's are optional.